DRE38 MAJOR SHUTDOWN

Client: Whitehaven

DRE38 MAJOR SHUTDOWN

Client: Whitehaven

VALUE: $1,225,000.00

DURATION: March 2024 – August 2024

NRG were engaged by Blackwater Mine, operated by Whitehaven Coal, to complete the Electrical package for the Major Shutdown on Dragline 38.
NRG Provided 1 x Electrical Coordinator, 3 x Electrical Supervisors and 19 x Electricians.

Major Electrical Scope Items:

  • DC Drive System Upgrade
  • Upgrade from 1x 275kVA Transformer to 3x 120kVA
  • Upgrade from GE DC 2000 Drives to Siemens Sinamic SRA80
  • Rewire all drive cabinets
  • Rewire of Power Cables to and from all Isolation Transformers incl. New Reticulation
  • Install of 2x Motor Field Trimming Panels
  • Complete Boom Rewire
  • Complete Cabin/Kitchen Rewire
  • Twiflex Brake Upgrade
  • Electrical Service of HV Switchboards
  • Replacement of House Fan and Bleed Duct Motors
  • Complete Vendor Equipment Require (Fire Systems, CCTV, Structural Monitoring, Payload Monitoring)
  • Cab & PCR A/C Overhaul
  • Complete Generator Replacement and Sync Motor Overhaul
  • Complete Lube Panel & Air compressor Overhaul
  • Complete Motor Replacement (Hoist, Drag, Swing, Propel) Including Blowers & Oil Pumps
  • Area Lighting Design and Installation
  • Management of Commissioning Documentation
  • Site set-up and decommissioning of Shutdown Offices.

OHS & QA FACTS

Environmental Incidents: 0
Safety Incidents: 0
Personal Risk Assessments: 2,394
JSA’s: 76
Field Leadership Completed: 162
Inspection Tests: 857